Tekton Partners
690 MHR plumbing systems — 3D View 1
MEP Engineering / Residential

690 MHR

LocationNew York
StatusExecution Design
Year2023
TypologyResidential Building
DisciplineMEP Engineering
Project TeamE. F.

Project description

The project covers the plumbing design for 690 MHR, including cold and hot water supply and wastewater drainage. The drawings detail the pipe network on the ground, first and second floors, including connections to sanitary fixtures and ventilation extended to the roof. They also show the bathroom and laundry installations, pipe diameters and gradients.

690 MHR plumbing systems — 3D view
Project documentation

Plans

Open plumbing drawing set (PDF) ↗
Water supply and wastewater drawings

Plumbing plans

690 MHR — Water Supply, First FloorWater Supply — First FloorDrawing
690 MHR — Wastewater, Ground FloorWastewater — Ground FloorDrawing
690 MHR — Wastewater, First FloorWastewater — First FloorDrawing
Building sections

Sections

690 MHR — Section 1Section 1Drawing
690 MHR — Section 2Section 2Drawing
690 MHR — Section 3Section 3Drawing