Tekton Partners
Administrative Building
Architecture / Administrative

Administrative Building

LocationGermany
StatusConcept design
Year2025
TypologyAdministrative
DisciplineArchitecture
Project teamAjdin Iseini

Project description

The proposal adds a new vertical circulation volume with a lift accessible to people with disabilities and an emergency stair. Internal spaces are reorganized to support new functions, while the façade remains untouched because the building is protected as cultural heritage. Administrative areas are arranged across two floors, with a division through the building and separate entrances on each side to allow more flexible rental options. The project covers the concept design stage only.

Administrative Building 3D view or rendering